Installed capacity: 133.5 MW – Average Annual Energy Produced: 518 Gwh Components: Geophysical and geotechnical investigations Hydrological study, hydropower system analysis Flood hydrology study – Sedimentation study Coordination of LIDAR surveyScheme Options reportTechnical feasibility study (incl. basic design, BoQ, Interconnnecting line to grid)LEC calculation (kWh price) – Negociation with off-takersBankable feasibility study (incl. input data for fin. model)

Energy

Client :
Kipay Investments

Tags :
Ingerop, Energy

Start Date : 2016
Handover : 2017