Energy

Project Intro

Installed capacity: 133.5 MW - Average Annual Energy Produced: 518 Gwh Components: Geophysical and geotechnical investigations Hydrological study, hydropower system analysis Flood hydrology study - Sedimentation study Coordination of LIDAR surveyScheme Options reportTechnical feasibility study (incl. basic design, BoQ, Interconnnecting line to grid)LEC calculation (kWh price) – Negociation with off-takersBankable feasibility study (incl. input data for fin. model)

Project Value: (Needs Price)

Project info

  • Client : MagEnergy
  • Tags : Ingerop, Energy
  • Start Date : 2007
  • Handover : 2008

Test Project / Heading

Dummy Text: It is a long established fact that a reader will be distracted by the readable content of a page when looking at its layout. The point of using Lorem Ipsum is that it has a more-or-less normal distribution of letters, as opposed to using ‘Content here, content here’, making it look like readable English. Many desktop publishing packages and web page editors now use Lorem Ipsum as their default model text, and a search for ‘lorem ipsum’ will uncover many web sites still in their infancy. Various versions have evolved over the years, sometimes by accident, sometimes on purpose (injected humour and the like).

Project Gallery